TANAP TRANS ANATOLIA NATURAL GAS TRANSMISSION LINE
|
Valve stations, Eskisehir pig stations valve, pipe,manufacturing and installation, hydrostatic testing paint and joint coating works | 1.750 Tons |
TANAP TEKFEN
|
2016-2019 |
EGE STAR REFINERY PROJECT
|
| |
SOCAR - TSGI -TEKFEN
|
2016-2019 |
Pipe, equipment, tank, insulation, manufacturing and installation works | 270.000 M2 |
Fireproofing applications | 85.000 M2 |
Surface preparation and paint applications | 350.000 M2 |
Scaffold installation and disassembling works | 3.200.000 M2 |
Refractory applications | 250Tons |
Ceramic applications | 30.000 M2 |
TANAP ANATOLIA NATURAL GAS TRANSMISSION LINE COMPRESSOR AND MEASUREMENT STATIONS PROJECT
|
Steel building installation and cladding works of Eskisehir Gelibolu Ipsala stations | 8.500 Tons |
TANAP TEKFEN
|
2016-2019 |
TURKMENISTAN GUNEY YOLATEN GAS FIELD DEVELOPMENT PROJECT
|
| |
PETROFAC - TEKFEN
|
2012-2014 |
Equipment tank pipe cycles insulation manufacturing and installation works | 120.000 M2 |
Pipe tank equipment surface preparation and epoxy paint works | 140.000 M2 |
coating works | 45.000 M2 |
BTC BAKU TBILISI CEYHAN CRUDE OIL PIPELINE PROJECT
|
Ceyhan crude oil storage tanks, tank inner and outer surface preparation and epoxy coating works | 320.000 M2 |
BP - TEKFEN
|
2005-2007 |
TAV ANKARA ESENBOGA AIRPORT DOMESTIC AND INTERNATIONAL TERMINAL PROJECT
|
Domestic and international terminal buildings steel manufacturing and installation works | 18.700 Tons |
AKFEN - NUROL
|
2004-2006 |
FAS JACOBS ENGINEERING PHOSPHATE MUD PIPE LINE AND STORAGE TANKS PROJECT
|
Pipes steel structures storage tanks surface preparation paint coating applications | 95.000 M2 |
JACOBS - TEKFEN
|
2012-2014 |
SAUDI ARABIA QURAYSH OIL FIELD DEVELOPMENT PROJECT
|
Surface cleaning of field pipes tank and equipments with surface preparation and coating with epoxy paint | 28.000 Tons |
ARAMCO - TEKFEN
|
2007-2008 |
BULGARIA MARITZA POWER PLANT PROJECT
|
Surface preparation of inner and outer surfaces of cooling tower with water jet and epoxy coating works | 60.000 M2 |
AES ALSTOM - TEKFEN
|
2009-2011 |
TURKMENISTAN HYUNDAI GAS AND SULPHURIZATION FACILITY
|
Steel construction manufacturing and installation works | 35.000 Tons |
HYUNDAİ
|
2011-2013 |
MACEDONIA SKOPJE REFINERY DEVELOPMENT PROJECT
|
Steel construction manufacturing and installation works | 18.500 Tons |
HELLENİC PETROLEUM
|
2010-2012 |
HYUNDAI ASSAN IZMIT FACTORY
|
Steel construction installation works | 12.300 Tons |
HYUNDAİ
|
1994-1995 |
CMI ADAPAZARI GEBZE POWER PLANTS
|
Spool manufacturing and installation works | 1.300 Tons |
ENKA - CMI
|
2002-2003 |
ERDEMIR 2ND COLD ROLLING MILL CAL BUILDINGS PROJECT
|
Manufacturing installation and epoxy paint works of building steel constructions | 15.700 Tons |
ERDEMİR
|
2000-2001 |
BTC BAKU TBILISI CEYHAN CRUDE OIL PIPELINE PROJECT
|
Posof Erzincan pump stations pipe manufacturing and installation works | 1.400 Tons |
BOTAŞ
|
2005-2007 |
PETROL OFISI IZMIT FACILITIES
|
Manufacturing and installation of 14 tanks of various diameters, manufacturing and installation of pipe cycles, painting works of tank and pipe lines | 2.500 Tons 60.000 M2 |
PETROL OFİSİ
|
2002-2003 |
GOLCUK FLEET COMMAND FRIGATE SCAFFOLD CONSTRUCTION PROJECT |
Scaffold steel and pipe welding mechanical works and coating with epoxy paint | 3.700 Tons 35.000 M2 |
STFA İNŞAAT
|
1999-2000 |
KUTAHYA ETIBOR FACTORY |
Manufacturing and installation of pipes, surface preparation and epoxy works of steel structures | 8.500 Tons 75.000 M2 |
ETİBANK
|
2001-2003 |
ADAPAZARI SUGAR FACTORY |
Manufacturing and installation of Melas and fuel-oil tanks surface preparation and application painting works. | 950 Tons |
ADAPAZARI ŞEKER FABRİKASI
|
2000-2001 |
MOSKOW GOLD PURITY TRADE CENTER PROJECT |
Manufacturing and installation of steel structure buildings, air conditioning and insulation works of cooling line pipe cycles | 2.850 Tons 32.110 M2 |
RG
|
2003-2004 |
BOTAS LNG IMPORTED TERMINAL PROJECT
|
Manufacturing and installation of steel structures, manufacturing and installation of pipe supports and sand blasting epoxy paint applications | 1.950 Tons |
BOTAŞ - STFA İNŞAAT
|
1999-2000 |
NUH CIMENTO SANAYI A.S. CLINKER PRODUCTION LINE PROJECT |
Raw mill gas channels manufacturing and installation works | 1.450 Tons |
GÜLERMAK
|
2003-2004 |
CANAKKALE CERAMIC FACTORIES |
Steel construction equipment manufacturing and installation works | 4.850 Tons |
ÇANAKKALE SERAMİK
|
2000-2001 |
BITOSSI CHEMICAL INDUSTRY
|
Gebze zircon and pigment buildings steel construction manufacturing and installation works, epoxy coating works of steel structures | 5.700 Tons |
BİTOSSİ - GERKONSAN
|
1995-1996 |
GEORGIA TBILISI EMBASSY BUILDING |
Steel construction manufacturing and installation works | 750 Tons |
RG
|
2003-2004 |
CULLIGAN ASHGABAT DRINKING WATER REFINEMENT FACILITY PROJECT |
Refinement facility tank manufacturing and installation works | 650 Tons |
NEMA KİMYA
|
2000-2001 |
IZMIT METROPOLITAN MUNICIPALITY REFINEMENT FACILITY |
Refinement facility ribbon type mixers band and conveyor manufacturing installation and industrial piping works | 350 Tons |
İZMİT BÜYÜKŞEHİR BELEDİYESİ İSU GENEL MÜDÜRLÜĞÜ
|
2003-2004 |
TEK SEYITOMER PLANT
|
4th unit steel pipe manufacturing and installation works | 22.800 Tons |
TOKAR YAPI VE ENDÜSTRİ TES.A.Ş.
|
1999-2000 |
HABAS BILECIK POWER PLANT
|
Manufacturing, installation, sand blasting, paint and insulation works of power plant pipe, shaft, tank and various equipment | 6.890 Tons |
HABAŞ ENDÜSTRİ TES.AŞ.
|
2001-2002 |
SONMEZ ASF BURSA |
Manufacturing and installation of 3 storage tanks of 20.000 m2, surface preparation and epoxy paint works of tanks | |
SÖNMEZ ASF İPLİK AŞ
|
1999-2000 |
TRAKYA CIMENTO SAN A.S. |
Installation works of cement mill no 3 | |
TRAKYA ÇİMENTO SAN AŞ
|
2001-2002 |
ALEMDAR HARBOR MANAGEMENT A.S. |
Manufacturing and installation technological pipe cycles, sand blasting and paint works of all field tanks | 950 Tons 88.000 M2 |
ALEMDAR LİMAN İŞLETMELERİ AŞ
|
2002-2003 |
ADAPAZARI METROPOLITAN MUNICIPALITY |
Manufacturing and installation of drinking water refinement facility's settling tanks, epoxy coating works | 375 Tons |
ADAPAZARI BÜYÜKŞEHİR BELEDİYESİ
|
2001-2001 |
RUSSIA STAVROPOLGALLERIYE SHOPPING CENTER
|
Steel construction manufacturing and installation works of the shopping centre building | 1.600 Tons |
RG
|
2003-2004 |
INTEK AS |
Steel construction pipe manufacturing and installation works | 1.200 Tons |
İNTEK AŞ
|
1998-1999 |